Commercial biogas plants
GET 601
Turns 30 kg of food waste or 180 kg of cow dung a day into about 3.2 kg of biogas.
- Biogas a day
- 3.2 kg
- Biogas a month
- 96 kg ≈ 7 domestic cylinders
- Food waste a day
- 30 kg
- or cow dung a day
- 180 kg
Price
₹1,35,000 + GST
Excludes additional equipment. Transport: client’s scope. 3-year warranty.
Specifications
GET 601 at a glance
- Model
- GET 601
- Feedstock per day
- 30 kg food waste or 180 kg cow dung
- Biogas a day
- 3.2 kg
- Biogas a month
- 96 kg (≈ 7 domestic cylinders)
- Burner
- Single canteen burner
- Flame
- High flame with booster pump
- Pipe connection
- 30 m CPVC pipe connection (client's scope)
- Transportation
- Client's scope
- Installation
- Client's scope
- Price
- ₹1,35,000 + GST, excluding additional equipment
Every Get Green plant
Built the same way
- Make
- FRP (fibre-reinforced polymer), certified material for small-scale biogas plants
- Design
- KVIC floating drum with water-jacket sealed column (approved by MNRE)
- Process
- Anaerobic digestion
- Reactor
- Vertical, portable
- Build
- Durable, weather-resistant, long operational life (25+ years)
- Warranty
- 3 years on the biogas plant
Where it fits
- Farms
- Agricultural cooperatives
- Dairy facilities
- Hostel kitchens
- Industrial canteens
Feedstock it accepts
- Canteen food waste
- Cow dung
- Pig manure
- Poultry waste
- Agricultural residues
- Sewage sludge
Optional equipment
Priced separately, if your site needs it.
- Crusher, for food and wet waste
- Automatic mixer and feed pump, for cow dung and farm use
- Booster pump
- Purifiers: H₂S scrubber and moisture trap
- Flow meter
Videos
See it working.
-
Feeding a 6 m³ plant
-
Double burner on biogas
-
Biogas for institutions (explainer)
-
Biogas for farms and dairies (explainer)
-
Biogas for industry (explainer)
Get a quote for the GET 601.
Tell us about your site and daily waste. An engineer will confirm the size and send a quote.

